TERMS & CONDITIONS

1. Scope of Work

Contractor shall provide only the work specifically identified within the accepted proposal.

Unless specifically listed, the following are excluded:

  • Surveying

  • Engineering

  • Permits

  • Utility relocation

  • Landscaping

  • Topsoil and seeding

  • Asphalt or concrete restoration

  • Environmental remediation

  • Rock excavation

  • Dewatering

  • Hauling of unsuitable soils

  • Testing and inspections

  • Erosion control beyond proposal scope

  • Imported fill

  • Compaction testing

  • Traffic control

  • Winter protection

  • Temporary fencing

  • Tree removal

  • Disposal of contaminated materials

Any additional work requested shall constitute a Change Order.

2. Site Conditions

Pricing is based upon conditions reasonably visible during estimating.

Should Contractor encounter:

  • rock

  • unsuitable soils

  • groundwater

  • buried debris

  • undocumented foundations

  • abandoned tanks

  • buried concrete

  • hazardous materials

  • archaeological findings

  • contaminated soils

  • unknown utilities

  • unforeseen subsurface conditions

Contractor shall immediately notify Owner.

Additional labor, equipment, materials, delays, or disposal costs shall be billed as a Change Order.

3. Underground Utilities

Owner represents that all underground utilities have been accurately located.

Contractor is not responsible for damage resulting from:

  • inaccurate utility markings

  • abandoned utilities

  • privately installed utilities

  • undocumented utilities

Owner shall be responsible for repair costs resulting from inaccurate information.

4. Access

Owner shall provide unrestricted site access including:

  • haul roads

  • staging area

  • equipment access

  • parking

  • material storage

Delays caused by restricted access shall be billed as additional time.

5. Schedule

Estimated schedules are not guaranteed.

Contractor shall not be liable for delays resulting from:

  • weather

  • utility conflicts

  • permit delays

  • owner delays

  • inspection delays

  • labor shortages

  • material shortages

  • force majeure

  • acts of God

Contractor reserves the right to adjust scheduling accordingly.

6. Weather Delays

Rain, freezing temperatures, excessive moisture, or other adverse weather may suspend operations.

Additional mobilizations resulting from weather shall be billed accordingly.

7. Payment Terms

Payment is due:

Net 15 Days

unless otherwise specified.

For projects exceeding $25,000, Contractor reserves the right to invoice:

  • Mobilization

  • Weekly Progress Billing

  • Stored Materials

  • Change Orders

  • Final Completion

Invoices not disputed in writing within five (5) business days shall be deemed accepted.

8. Late Payments

Past due invoices shall accrue:

  • 1.5% interest per month

  • (18% annually)

  • or the maximum allowed by law.

Customer agrees to pay:

  • attorney fees

  • collection costs

  • court costs

  • lien filing expenses

incurred during collection.

9. Right to Stop Work

Contractor reserves the right to suspend work if:

  • invoices become past due

  • financing is unavailable

  • Owner breaches the agreement

Contractor shall not be responsible for schedule impacts resulting from suspended work.

Restart costs, remobilization, and escalation shall be billed to Owner.

10. Mechanic's Lien Rights

Contractor expressly reserves all rights provided under applicable mechanic's lien statutes.

Receipt of payment does not waive lien rights until funds have fully cleared.

11. Change Orders

Any work outside the original proposal shall require a written Change Order.

If immediate work is necessary to protect persons, property, utilities, or schedule, Contractor may proceed upon verbal authorization and subsequently document the change.

12. Owner Responsibilities

Owner shall:

  • obtain property access

  • identify property boundaries

  • provide legal right-of-entry

  • remove personal property

  • secure permits not included in proposal

  • coordinate other trades

Delays caused by Owner shall be billed accordingly.

13. Imported Fill

Unless specifically stated:

All imported material shall be billed separately.

Imported material prices are subject to market fluctuations.

14. Disposal

Proposal assumes clean, non-contaminated soil.

Discovery of:

  • contaminated soils

  • asbestos

  • petroleum products

  • hazardous waste

  • regulated materials

shall constitute additional work.

Testing and disposal costs shall be billed separately.

15. Fuel & Material Escalation

Contractor reserves the right to adjust pricing for substantial increases in:

  • diesel fuel

  • aggregate

  • pipe

  • steel

  • trucking

  • disposal fees

occurring after proposal acceptance.

16. Equipment Damage

Owner shall be responsible for damage caused by:

  • hidden structures

  • unmarked utilities

  • improper access

  • unstable soils not disclosed

17. Property Damage

Contractor shall exercise reasonable care.

However Contractor is not responsible for:

  • cracked driveways

  • lawn damage

  • rutting

  • settlement

  • irrigation damage

  • landscaping disturbance

reasonably resulting from construction operations unless caused by Contractor negligence.

18. Grade Tolerances

Finished grades are subject to standard construction tolerances.

Minor settlement following completion is normal and not considered defective work.

19. Warranty

Contractor warrants workmanship for:

One (1) Year

from substantial completion.

Warranty excludes:

  • settlement

  • erosion

  • weather damage

  • owner modifications

  • utility failures

  • acts of God

  • improper maintenance

  • third-party damage

20. Limitation of Liability

Contractor's maximum liability shall not exceed the contract amount.

Contractor shall not be liable for:

  • lost profits

  • business interruption

  • consequential damages

  • indirect damages

  • delay damages unless expressly agreed in writing

21. Insurance

Contractor maintains Commercial General Liability and Workers' Compensation insurance.

Certificates provided upon request.

22. Safety

Contractor maintains exclusive control over means, methods, sequencing, equipment, and safety procedures.

Customers and visitors shall remain outside active work zones.

23. Acceptance of Work

Work shall be deemed accepted upon:

  • Owner occupancy

  • beneficial use

  • payment

  • failure to provide written deficiencies within five (5) days

24. Cancellation

If Owner cancels after acceptance:

Owner shall pay for:

  • completed work

  • mobilization

  • ordered materials

  • restocking fees

  • equipment reservations

  • subcontractor commitments

25. Photographs

Contractor may photograph project progress for documentation and marketing purposes unless prohibited in writing.

26. Force Majeure

Contractor shall not be liable for delays caused by:

  • severe weather

  • natural disasters

  • strikes

  • pandemics

  • war

  • governmental actions

  • material shortages

  • utility interruptions

27. Dispute Resolution

The parties agree to first attempt mediation.

If unresolved, disputes shall be resolved in the county where the project is located unless otherwise agreed.

Prevailing party shall recover attorney fees and costs where permitted by law.

28. Entire Agreement

These Terms & Conditions, together with Contractor's proposal, constitute the complete agreement.

No verbal representations shall modify this agreement.

29. Electronic Signatures

Electronic signatures, email acceptance, and digital approvals shall have the same force and effect as original signatures.

30. Proposal Validity

Unless otherwise stated:

Proposal pricing is valid for:

30 calendar days

Material pricing may be adjusted after expiration.

Recommended Front-of-Proposal Payment Terms

I also recommend placing the following directly on the first page of every proposal to make expectations unmistakably clear:

Payment Schedule

  • 20% Deposit due upon acceptance (for projects over $10,000)

  • Weekly progress billing

  • Change Orders due immediately upon invoicing

  • Final payment due within 15 days of substantial completion

Change Orders

No additional work will be performed without written approval unless required to protect life, safety, or the project schedule.

Stop Work

Accounts more than 15 days past due are subject to immediate suspension of work until payment is received.

Interest

Past due balances accrue interest at 1.5% per month (18% annually) or the maximum rate permitted by law.

Mechanic's Lien

E&E Excavating reserves all mechanic's lien and bond rights until payment has been received in full.

Quote Validity

Proposal pricing is valid for 30 days and is subject to material and fuel price escalation thereafter.